Supervised daily operations and workflows on construction sites.
- Conducted safety inspections and enforced compliance with regulations.
- Trained new employees on tools, equipment, and safety procedures.
- Ensured all workers adhered to company policies and procedures.
- Assessed work area conditions for potential hazards or risks.
- Provided guidance, direction, and technical assistance to crew members.
- Supervised activities of personnel assigned to various tasks during construction jobs.
- C.R.C. Construction – Tiverton River Bridge Project (Rhode Island)
Served as Foreman, then General Foreman of all waterborne and land piledriving operations. Responsible for coffer dams, whaler systems, and H-beam conventional systems. Driving Foreman for both sides of the river (joint venture). Met J. McNulty while working for Jay Cashman.
- Fort Point Channel Project (Late 1990s)
Worked approximately 3 years. Served as Foreman on piledriving operations. Also performed waterborne operations including driving coffer dams off barges, drilling operations, and soil mech driving sheets on land to support excavation and lagging for bridge at Cell Three (Jay Cashman dredging operations).
- Fort Point Channel Tunnel Project
Worked with Modern Continental for almost 2 years. Performed structural welding and fabricating inside tunnels, sinking operations of the first and second tunnel, and disassembling of the winch system after tunnels were in place.
- Fore River Bridge Project
Erection and piledriving of temporary bridge for Middlesex Corp (approximately 3 years).
- World Trade Center – Boston (Barletta)
8-ft Caisson Rehab – General Foreman in charge of Piledrivers and Divers on the project (2×2 job) for approximately 2 years.
- Ted Williams Tunnel Renovation (Kiewit Construction)
Total renovation of the end of the Ted Williams Tunnel, bridge footings at Levitt Circle, and concrete pilings at Terminal A for new overpass.
- Multiple Projects with Carter Pile Driving
Primarily land-based work including pipe piles, concrete piles for foundations, and wood pilings. Notable locations include multiple Minot Beach sites for condominiums and restaurants, the new hotel at the airport, and tower crane pads.
- Additional Duties
Loading/offloading and maintenance of paint barge within allotted timeframes (W.T.C. project).
- Washington Bridge, Rhode Island (Nefco) driving 8-ft Caisson. Served as Drive Foreman (1-year job).
• Fore River – Pile Extraction for Cashman new bridge project.
• New Bedford – 1800 Pier (Cashman Weeks Venture)
Served as Foreman for 1½ years.
• Charlestown Navy Yard – 3-Tier Whaler System. Almost 12,000+ ft of whaler system. Served as Foreman for J. Cashman (1½ years).
• Salem / Beverly – Hot Tap Project (J. Cashman) Cofferdam and Hot Tap on 36” gas line. Served as one of the Foremen on the barge.